Roadmap
Snapshot of what’s shipping across the Sync stack. Dates are grouped by quarter so we can keep this page close to delivery reality; each item links back to the SDK and managed UI surfaces touched.
Now — Q4 2025
@fractalshq/syncprivate beta (Status: in flight). Exposedistributions.create,claims.prepare, and cohort CRUD over a stable REST surface; ship the React hooks + SDK.- Managed UI polish (Status: in flight). Hardening cohort CSV ingestion, DePIN deployer permissions, and split template drafts so non-engineering teams can prep distributions without touching code.
- Docs instrumentation (Status: queued). Light up live demos in the docs (creation + claim) with staging data toggles.
Last updated on